Colorado’s Trusted Plumbing, Heating and Cooling Company Since 1957

Reliable Commercial & Residential Service. 24/7 Live Answer.

Commercial Construction

The Foundation of Your Infrastructure: Decades of Commercial Excellence.

{ "@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [ { "@type": "Question", "name": "What is your experience with Senior Living and Multi-Family plumbing codes?", "acceptedAnswer": { "@type": "Answer", "text": "We have extensive experience with IBC and IPC requirements for Senior Living and Multi-Family builds like Montview Flats, ensuring ADA compliance and adherence to local health department standards." } }, { "@type": { "Question", "name": "How do you handle project timelines and coordination with other trades?", "acceptedAnswer": { "@type": "Answer", "text": "We utilize BIM and pre-fabrication to ensure rough-ins are completed ahead of schedule, maintaining close communication with GCs to meet all Critical Path milestones." } } }, { "@type": "Question", "name": "Do you provide design-build plumbing services for new construction?", "acceptedAnswer": { "@type": "Answer", "text": "Yes, we offer design-build services to identify value-engineering opportunities early, optimizing systems for high-density residential needs while reducing overall costs." } }, { "@type": "Question", "name": "What quality control measures do you use to prevent future leaks?", "acceptedAnswer": { "@type": "Answer", "text": "We perform multi-stage pressure testing exceeding code requirements and use high-grade materials to ensure long-term durability and quiet operation in shared-wall environments." } }, { "@type": "Question", "name": "How do you address the unique plumbing needs of Senior Living facilities?", "acceptedAnswer": { "@type": "Answer", "text": "We prioritize safety with master mixing valves for anti-scald protection, ADA-compliant fixtures, and high-reliability systems designed for ease of facility maintenance." } } ] }

Since 1957, Befort Plumbing and Heating has been a foundational partner in the growth of the Denver Metropolitan area. Our Commercial Construction division is uniquely equipped to handle the complexities of high-stakes development, from soaring class-A high-rises and expansive retail malls to specialized medical centers and hospitality hubs. With four generations of hands-on experience, we provide more than just labor; we offer strategic insight.

Since 1957, Befort Plumbing and Heating has been a foundational partner in the growth of the Denver Metropolitan area. Our Commercial Construction division is uniquely equipped to handle the complexities of high-stakes development, from soaring class-A high-rises and expansive retail malls to specialized medical centers and hospitality hubs. With four generations of hands-on experience, we provide more than just labor; we offer strategic insight.

65 Years of Proven Reliability

We don’t just install pipes; we build the systems that keep your business running. Since 1957, we have been the silent partner behind Denver’s most complex commercial developments. With over Six decades of hands-on experience, we’ve seen the evolution of building codes and technology, ensuring every project we touch is future-proof and compliant from day one.

A Befort Plumbing * Heating Work Truck Puls Up to a Job

Previous & Current Projects

At the iconic Denver Dry Preservation building, our team is executing a comprehensive, top-to-bottom plumbing modernization that marries 21st-century efficiency with historic structural integrity. This “whole-works” remodel involves a complete replacement of the building’s aging infrastructure, including the installation of new main water service lines and a total redesign of the sewer and waste-management networking. Moving upward through the core, we are engineering and installing new hanging PVC distribution lines, ensuring quiet operation and long-term durability.

Within the units, our scope covers the full installation of modern showers, tubs, and high-efficiency fixtures, replacing outdated systems with precision-fitted, code-compliant solutions. This project demonstrates our ability to navigate the unique constraints of a preservation build—where every pipe run and fixture placement must be executed with surgical precision to protect the architectural heritage while delivering a brand-new, high-performance plumbing system.

For the Montview Flats new construction project, our team is delivering a comprehensive, turnkey plumbing infrastructure designed for long-term durability and peak operational efficiency. Our scope encompasses the full mechanical lifecycle of this multi-family development, from the precision-engineered underground sanitary and storm-water rough-ins to the final installation of high-efficiency fixtures in every unit. To support the building’s vertical density, we are implementing a robust pressure-boosted domestic water system and a centralized high-recovery hot water plant, ensuring consistent delivery across all floors. By integrating advanced DWV (Drain, Waste, and Vent) networking and rigorous multi-stage pressure testing, we are ensuring that Montview Flats meets the highest standards of modern urban living while providing the developer with a low-maintenance, code-compliant mechanical backbone.

Befort Plumbing and Heating played a key role in the revitalization of the Renaissance Hotel’s central gathering space: the Lobby Bar. Renovating a focal point in a functioning hotel requires efficiency, cleanliness, and precise coordination to minimize downtime.

Our team managed the complete plumbing overhaul for the bar’s redesign. This involved disconnecting and removing existing infrastructure and re-routing utilities to accommodate the new architectural layout. We installed new sanitary and water lines to support the high-volume demands of a hotel bar, ensuring reliable drainage and supply pressure.

new construction project, engineered to meet Hilton’s rigorous standards for guest comfort and building longevity. The scope of work for this multi-story hospitality build includes the design and installation of a high-capacity centralized hot water system featuring redundant boiler arrays to ensure zero-downtime service for guests. We are implementing precision-engineered pressure-regulated water distribution and advanced acoustic dampening for DWV (Drain, Waste, and Vent) piping to minimize guest-room noise transfer—a critical metric in modern hotel construction. From the heavy-duty commercial kitchen and laundry facilities to the uniform, high-efficiency fixtures in every guest suite, our installation at the Hampton Inn is built for high-occupancy durability, water conservation, and seamless integration with the building’s overall mechanical footprint.

Our team is currently managing the comprehensive ground-up plumbing and mechanical infrastructure for the three-building expansion at Water World in Federal Heights. This complex “from-the-dirt” project involves the installation of high-capacity main water distribution systems and specialized high-volume drainage networking designed to handle the rigorous demands of the park’s newest attraction area, Summit Canyon. Beyond the standard commercial requirements, our scope includes the mechanical backbone for modern guest amenities, including new food and beverage facilities and climate-controlled cabana structures.

From the initial underground rough-ins and heavy-duty sewer main connections to the final installation of high-efficiency, hospitality-grade fixtures, we are ensuring that these new facilities meet both Hyland Hills District standards and the high-traffic durability required for one of the nation’s largest water parks. Our coordination with the site’s aquatic engineering teams ensures that the domestic plumbing integrates seamlessly with the park’s sophisticated water-treatment and circulation systems.

Our team is spearheading the complete, ground-up plumbing and mechanical infrastructure for the new WWII Victory Museum at 775 Aviation Way. This specialized project at Centennial Airport demands a high-precision installation designed to protect both historical aviation assets and the thousands of veterans and visitors who will walk its halls. Our scope of work encompasses the entire mechanical lifecycle, from heavy-duty underground sanitary and storm-water systems to the installation of high-efficiency, multi-zone commercial hot water plants. Given the museum’s mission, we are implementing rigorous anti-leak secondary containment protocols and precision-engineered drainage to ensure zero risk to the priceless aircraft and memorabilia on display.

From the sophisticated public restroom facilities and administrative wings to the specialized workshop and hangar-bay drainage systems, our work at the WWII Victory Museum is built for high-occupancy durability and the long-term preservation of Colorado’s aviation history.

Our "Zero-Compromise" Standard

David Hayutin

Director of Health and Safety

  • Certified Professionals: Every crew member undergoes continuous safety training and specialized rigging/trenching certifications.

  • Proactive Mitigation: Daily “Toolbox Talks” and site-specific hazard assessments are mandatory before a single wrench is turned.

  • Drug-Free Workplace: We maintain a 100% drug-free environment to ensure total focus on the job site.

Quick Faqs

What is your experience with multi-family and hospitality plumbing codes?

We have extensive experience navigating the specific IBC (International Building Code) and IPC (International Plumbing Code) requirements for large-scale builds like Montview Flats and Hampton Inn. Our team ensures every installation—from centralized hot water plants to complex DWV networking—is franchise-compliant and passes municipal inspections the first time.

We prioritize “Critical Path” scheduling. By utilizing BIM (Building Information Modeling) and advanced pre-fabrication, we ensure our rough-ins are completed ahead of the framing and drywall schedules. We maintain open communication with General Contractors to prevent logistical bottlenecks and ensure the project hits its “Dry-In” and “Substantial Completion” dates.

Yes. We offer comprehensive design-build capabilities, allowing us to partner with developers early in the pre-construction phase. This approach helps identify value-engineering opportunities—such as optimizing riser locations or selecting high-efficiency boiler arrays—that can significantly reduce overall project costs without sacrificing system performance.

We implement a multi-stage pressure testing protocol that exceeds standard code requirements. Every joint and fixture is subjected to air and water testing before walls are closed. Additionally, we use high-grade materials and acoustic dampening for waste lines to ensure the long-term durability and quiet operation essential for high-density residential and hotel environments.

For Senior Living projects, we prioritize safety and accessibility. This includes the installation of Master Mixing Valves for precise anti-scald protection, ADA-compliant fixtures, and walk-in bathing systems. We engineer these systems for high reliability and ease of maintenance, ensuring that facility operators can manage the building with minimal disruption to residents.